Downloads

  • Masterplan

    The overarching vision for 1881 Tullimbar, including the placement of homes, roads and local amenities. Please click on the icon to download.

    pdfMasterplan
  • Brochure

    Discover the 1881 Tullimbar story through our project brochure, which includes introductory information about the local area, our plan, the developer and more.

    pdfBrochure
  •  

    Approval Process

    Step 1 - Ensure your house design meets the Development Control Plan, Ensure your house design meets the Development Control Plan, Complying Development Code (if applicable) and 1881 TullimbarDesign Guidelines

    Step 2 Apply Pre-lodgement Approval by submitting your “Pre-lodgement Application Form” to the Dahua Design Administrator at This email address is being protected from spambots. You need JavaScript enabled to view it. The Dahua Design Administrator will reply within 21 days of receiving your“Pre-Lodgement Application Form”.

    Step 3 Home completed in accordance with approvals and Occupation Certificate issued

    Step 4 Complete your front landscaping

    Step 5 To claim your $2,000 Compliance Bond – complete the Compliance Bond Release Form (Refer to section 3.3). Submit to Design Administrator at This email address is being protected from spambots. You need JavaScript enabled to view it. upon completion of your home and landscaping

     
  •  

    Design Guidelines

    These building guidelines form part of our commitment to creating a community that is a great place to live, both now and well into the future.

    These guidelines apply to all dwellings to be built and will form part of the contract you enter into when you purchase land at 1881 Tullimbar.

    These regulations are strictly aesthetic in their intent. In no way does compliance with these regulations exempt a structure from compliance with local authority requirements.

    These building guidelines spell out how houses can be part of an attractive street and a great neighbourhood. There are several elements to the guidelines, which together define the character or ‘essence’ of 1881 Tullimbar.

  •  

    Bushwalks Release Plans 1A & 1B

    The Bushwalks Release takes its name from the maze of incredible bushwalks only a short drive from 1881 Tullimbar. With lots ranging from 337.5m2 to 1066m2, this release is perfect for owner-occupiers to build their dream home.

  •  

    Picnic Release Plan

    The Picnics Release is an ode to the simple gesture of a picnic with friends; creating a place with nothing but a blanket. With lots ranging from 300m2 to 900.9m2, the Picnic Release is designed for first-home buyers and mover-uppers.

  •  

    First home buyers information sheet

    For those embarking on their first home buying journey, the 1881 Tullimbar First Home Buyers Information Sheet gives a little more information to help you better understand the NSW First Home Owners Grant and the NSW First Home Buyers Assistance scheme.

    pdfFirst home buyers information sheet